Note the site instructions and any other relevant directives onto the drawings used in inspection, to ensure that they are taken into account during and inspection.
Check the architectural works against the drawings and to inform the Assistant Resident Architect and the Contractor of any discrepancies.
Prepare a written list of any points which may require attention, in conjunction with the Assistant Resident Architect, where the Contractor has asked for the inspection. Then, to pass the list to the Contractor’s foreman; check that this point has been rectified or agreed before this part of works is covered, unless the Assistant Resident Architect advises that relaxation of requirements has been agreed while a copy of this list should be passed to the Resident Engineer.
...