Knowledge in testing of experience in MV, LV Switchgears and Transformers.
Operating and interlock checking
Knowledge of Transformer Differential Protection & REF Protection and its stability test, Bus bar protection and its stability test, over current & Earth fault protection.
...
Planning and scheduling the T&C activities defining the pre-requisites and the priorities complying with project tools, stakeholders’ requirements and project constraints of timing and location.
Ensuring all the design related documents for projects are available and in line with project specifications, applicable standards, local government rules and regulations.
Preparation of Method statements, Inspection and Test Plan (ITP) for testing and commissioning activities
...
· During the project execution, be a leader for design/ engineering related activities, attending customer/supplier meetings and assist in getting the approval of engineering documents from customer.
· Planning and scheduling the T&C activities defining the pre-requisites and the priorities complying with project tools, stakeholders’ requirements and project constraints of timing and location.
· Ensuring all the design related documents for projects are available and in line with project specifications, applicable standards, local government rules and regulations.
...
Specialisation 1: Process Analyzer and System for measuring process quality in the plans
Specialisation 2: Well rounded, multi-disciplinary mechanical work, electrical power and control system, chemical process applications and equipment operating system, some IT and network
Specialisation 3: Executive assigned job or work such as in-house testing, site commissioning, site modification, customer training and site survey.
...
Specialisation 2: Well rounded, multi-disciplinary mechanical work, electrical power and control system, chemical process applications and equipment operating system, some IT and network
Specialisation 3: Executive assigned job or work such as in-house testing, site commissioning, site modification, customer training and site survey.
Plan for jobs and organise work pro-actively at least 1 week in advance to ensure high utilisation rate.
...
· Proving technical support to bid team on pre bid activities as and when required
· During the project execution, be a leader for design/ engineering related activities, attending customer/supplier meetings and assist in getting the approval of engineering documents from customer.
...
Knowledge in testing of experience in MV, LV Switchgears and Transformers.
Operating and interlock checking
Knowledge of Transformer Differential Protection & REF Protection and its stability test, Bus bar protection and its stability test, over current & Earth fault protection.
...
TB-L22, Level 22, Tower B, Plaza 33, 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor
Daikin Malaysia Sales & Service Sdn. Bhd (DMSS) is subsidiary company of Daikin Industries, Ltd. Japan and marketing company for DAIKIN air conditioner (unitary products) and DEWPOINT products in Malaysia. Since its establishment in 1975, the company has been experienced unparalleled growth and development through its efforts in bringing cool comfort to millions of Malaysian.
In 1991, DMSS continued to reach greater heights by becoming one of the subsidiaries of Daikin Malaysia Sdn Bhd, one of the leading manufacturer of HVAC products (heating, ventilation and air-conditioning) and also a member of the DAIKIN group Japan.
...
Conduct all required Test Procedures, methodologies, and equipment testing activities on site related to the project to obtain the customer's sign-off.
Preparation of technical proposals (testing and commissioning) for submission
To arrange all test equipment required for testing in coordination with the site Manager & team leader.
...
Collaborate with in-house AV Designers and Engineers from various manufacturers and others to develop fully integrated solutions for venues such as meeting rooms, lecture halls, experience centers, command centers, auditoriums, and ballrooms.
Examine the schematic drawings to determine the technical and functional requirements for implementing each solution.