Witness testing of all materials and work done as per the date and time requested by WPC.
Taking note the site instructions and any other relevant directives onto the drawings used in inspection, to ensure that they are taken into account.
Prepare a written list of any points which may require attention, in concurrence with the RE, where the WPC has asked for the inspection. The COW is to check the points have been rectified or agreed to before the work is covered, as the case may be.
...
Witness testing of all materials and work done as per the date and time requested by WPC.
Taking note the site instructions and any other relevant directives onto the drawings used in inspection, to ensure that they are taken into account.
Prepare a written list of any points which may require attention, in concurrence with the RE, where the WPC has asked for the inspection. The COW is to check the points have been rectified or agreed to before the work is covered, as the case may be.
...
Witness testing of all materials and work done as per the date and time requested by WPC.
Taking note the site instructions and any other relevant directives onto the drawings used in inspection, to ensure that they are taken into account.
Prepare a written list of any points which may require attention, in concurrence with the RE, where the WPC has asked for the inspection. The COW is to check the points have been rectified or agreed to before the work is covered, as the case may be.
...
Witness testing of all materials and work done as per the date and time requested by WPC.
Taking note the site instructions and any other relevant directives onto the drawings used in inspection, to ensure that they are taken into account.
Prepare a written list of any points which may require attention, in concurrence with the RE, where the WPC has asked for the inspection. The COW is to check the points have been rectified or agreed to before the work is covered, as the case may be.
...
Note the site instructions and any other relevant directives onto the drawings used in inspection, to ensure that they are taken into account during and inspection.
Check the architectural works against the drawings and to inform the Assistant Resident Architect and the Contractor of any discrepancies.
Prepare a written list of any points which may require attention, in conjunction with the Assistant Resident Architect, where the Contractor has asked for the inspection. Then, to pass the list to the Contractor’s foreman; check that this point has been rectified or agreed before this part of works is covered, unless the Assistant Resident Architect advises that relaxation of requirements has been agreed while a copy of this list should be passed to the Resident Engineer.
...
To be responsible for checking all construction drawings and highlight discrepancies or lack of information and following up site matters with contractors, consultants and relevant authorities (technical or non-technical).
To supervise, control, co-ordinate and monitor the activities of workers engaged at the construction site by ensuring that all works are carried out in accordance to schedules, drawings, specifications and client’s requirements.
...
Conduct periodic checks on works and liaise frequently with contractors, subcontractors and consultants works achieve high standard of quality and workmanship.
Record and monitor all matters pertaining to construction activities and progress of work.
Ensure delivery of materials are as specified and on time.
...